MT Norris Boy Scout Camp BMP Final Design Complete!

2021-12-20_MtNorris_FINAL_Stormwater_Plans  Mt Norris Boy Scout Camp BMP (Best Management Practice) Final Design Through a grant provided by the New England Interstate Water Pollution Control Commission (NEIWPCC) and the Lake Champlain Basin Program (LCBP) in 2021,...

Valley Dream Farm River Corridor Easement

LCCD would like to thank Valley Dream Farm for partnering with the Vermont Land Trust (VLT)  to establish a River Corridor Easement (RCE) along a reach of the Seymour River that bisects their property. The Lamoille River Tactical Basin Plan ranks the Seymour River as...

Summer Camps Update

In an effort to do our part to keep our campers and staff safe and healthy during this time, we have made the difficult decision to cancel our 2020 summer day camps.